A Cold Storage Project in Meishan

A Cold Storage Project in Meishan

Project Overview

Heavy-duty beam racking has been installed to support the large-scale cold chain facility in the Meishan Bonded Port Area. The racking system allows for direct pallet storage and retrieval by forklifts, features adjustable shelf heights, and offers flexible storage and retrieval capabilities, meeting the needs for high-volume palletized storage and rapid turnover of imported fresh produce.
  • Logistics & Warehousing / Third-Party Logistics (3PL)
    Logistics & Warehousing / Third-Party Logistics (3PL)
  • Standard Selective Pallet Racking
    Standard Selective Pallet Racking

Project Data Results

Located in the Meishan Bonded Port Area, this project is a large-scale port cold-chain warehousing facility primarily used for the bonded storage and rapid distribution of imported fresh produce. Our company has supplied standard beam racking for this project. This racking system is a classic pallet storage solution that allows forklifts to directly access pallets at any storage location. The shelf heights are flexibly adjustable, the structure is stable, and maintenance is simple. It effectively increases warehouse capacity and meets the demands of high-volume palletized goods entering and leaving the facility, aligning with the fast-turnover nature of port cold-chain operations.
  • 7,8954
    Pallet Positions
    Total Cargo Location
  • 1000
    kg/Pallets
    Unit Load
  • 8.4
    m
    Total Height of Shelves